The AI model benchmark read on November 23 shows the first place at 65 index points and $26.54 per task, with a 57-point model at $1.01. That is eight index points for 26.3 times the cost, and the curve only bends at the last step.

Key facts

  • Top: 65 points, $26.54 per task, 41.4 minutes per task.
  • Eight points below: 57 points, $1.01 per task, 26.3 times cheaper.
  • Step from 62 to 65: $22.54 for three points, 88% of the entire top premium.
  • Decision rule: the top pays for itself when the accuracy gain times the cost of a failed task exceeds $25.53.

Which numbers in the AI model benchmark support the Nov 23 read?

Six models sum up the read, all priced per task: 65 points at $26.54, 62 at $4.00, 57 at $1.01, 54 at $3.16, 51 at $0.96 and 50 at $9.95. From them come the 26.3 and 27.6 times ratios and the $22.54 step between 62 and 65 points.

The read is a snapshot, not a series. The first place on October 19, with 58 points, now appears with 59 and lost the lead to a 65-point model. The count fell from 134 to 126 ranked models and from 67 to 56 open weights, the only two aggregates comparable across the two reads.

Seven numbers carry the rest of the article:

  1. Eight index points cost 26.3 times more per task, $26.54 against $1.01.
  2. Fourteen points cost 27.6 times more, $26.54 against $0.96.
  3. Inside the Gemini 4 family, the 50-point model costs 3.15 times more than the 54-point one.
  4. The step from 62 to 65 holds 88% of the entire premium paid over the 51-point model.
  5. One index point costs $0.41 at the top and $0.018 at 57 points, a 23 times difference.
  6. The top spends 4.2 times more time per task than the 57-point model.
  7. The read recorded 126 ranked models, against 134 on October 19.

The difference between this piece and the earlier ones in the sub-line is the question, not the data. Two published posts already measured cost per task between two models, always with a binary choice at the end. Here the question is the derivative: what the next point costs, and from which task it stops paying for itself.

How was the data collected?

Collection is a static read of the Artificial Analysis leaderboards page on November 23, 2026, with 53 models visible with index and cost per task. Every multiple, cost per point and break-even figure is arithmetic over those values, and none of them is a new Nexforce measurement.

The index and the cost per task are Artificial Analysis methodology, and Nexforce did not run the benchmark. The task suite is theirs, not the buyer's: context, cache hit and prompt length change the bill before any architecture decision.

The sample is smaller than the comparison set. The page reports more than 250 models, the read recorded 126 ranked and the table without expanded columns returned 53 rows, which are the base of the curve. The page also does not reprint the index version: the previous state recorded v4.3.2, and the text cites the index without a version number because the November 23 version was not confirmed.

Each row carries an effort label, max, xhigh or high, which changes cost and quality inside the same model, and comparing rows with different labels is not a like-for-like comparison. The Gemini 4 Hydrogen against Argon pair is the case that demands the caveat. The page now prints time per task in minutes, so the tokens per second series is not comparable and no speed delta is claimed here.

Two limitations close the method. The index is a composite, and a model can lead the composite while losing on the buyer's specific task, which is why the buyer measures that task before paying the step. And no projection in this study is a measurement: the break-even table in section 7 is a criterion with one free variable.

On the series, only two aggregates are comparable between October 19 and November 23, the model count and the open weights count, and there is no price series per model across the two reads, so the text claims no price trend. What has already been measured on launch and cost per task answers another question; here the question is the slope of the curve at the top.

How much does one index point cost at the top of the table?

At the top, one index point costs $0.41 per task. In the 57-point model, the same point costs $0.018. The 23 times difference does not come from a better price per token, it comes from the index growing far slower than cost above 57 points.

Model (effort label)IndexCost per task (US$)Cost per index point (US$)
Claude Fable 5.2 (max)6526.540.41
GPT-6.2 Astra (max)624.000.06
Gemini 4 Neon (xhigh)616.440.11
Gemini 4 Carbon (high)607.760.13
Claude Opus 5.5 (max)5910.040.17
GPT-6.2 Sol (max)571.010.018
Claude Sonnet 5.5 (max)5510.020.18
Gemini 4 Hydrogen (xhigh)543.160.06
GPT-6.1 Terra (max)510.960.019
Gemini 4 Argon (high)509.950.199

Table source: Artificial Analysis, Nov 23, 2026 read; the cost per point is a division performed in this study.

The right column is a simple division of cost per task by index, and what it shows is that price per unit of index does not order the table. The cheapest row per point is the 57-point one, at $0.018, and not the 51-point one, which costs $0.019 per point.

The counterexample sits in the last row. The 50-point model costs $0.199 per point, eleven times the value of the 57-point model and seven index points below it. Price per point is not monotonic in the index: whoever assumes the index column orders the cost per capability is wrong inside the band itself.

The useful read is narrower. Above 57 points, cost per point climbs from $0.018 to $0.41 across a distance of eight points. Below 57, the variation answers to the effort label and to each vendor's commercial policy, two factors that do not measure capability, and neither column replaces a test on the buyer's task.

Where does the curve bend?

The cost frontier is a three-step staircase, not a straight line. Reaching 51 points costs $0.96 and 57 points costs $1.01, five cents for six points. The jump from 62 to 65 costs $22.54 for three points, 88% of the entire premium at the top.

Cost per task staircase to reach each index threshold, from $0.96 at 51 points to $26.54 at 65 points.

The frontier is the lowest cost per task able to reach each index threshold, and it has three jumps because two very cheap models cover a wide range of thresholds.

StepThreshold reachedLowest cost per task (US$)Step cost (US$)Cost per point in the step (US$)
Base51 points0.96does not applydoes not apply
157 points1.010.05 for 6 points0.008
262 points4.002.99 for 5 points0.60
365 points26.5422.54 for 3 points7.51

Two readings are mandatory in this table. The first: 88% of the total premium of the top, the $22.54 of $25.58 over the 51-point base, sits in the last three index points. The second: the 62 step delivers 95.4% of the top index for 15.1% of the cost, which makes it the natural candidate for whoever needs more capability without paying the last step.

There is no intermediate step at 54 or at 59, and the reason is arithmetic. The 57-point model costs less than every model between 54 and 57, and the 62-point one costs less than the 59 and 60-point models, so the frontier jumps over them. Whoever has read what makes up the intelligence index recognizes the pattern: the composite is an average over several tasks, and the cost frontier rewards the model that is good enough on all of them at the lowest price.

The ratio between the top step and the 51 to 57 step is about 900 times per point. It is the number that explains why the commercial conversation at the top is never about price per token, but about ranking position.

Why can the higher-index model cost less within the same family?

The effort label explains part of the difference: Gemini 4 Hydrogen runs at xhigh and costs $3.16 with 54 points, while Gemini 4 Argon runs at high and costs $9.95 with 50 points. Price inside the family answers to effort before it answers to index.

The Gemini 4 family pair is the clearest case in the read. It is 3.15 times the cost for four points less, but the labels are not the same and the comparison is not like-for-like. A symptom, not proof.

The second pair is cleaner, because both carry the max label. Claude Opus 5.5 costs $10.04 with 59 points and Claude Sonnet 5.5 costs $10.02 with 55 points: two cents separate four index points. In that band, the vendor's list price stopped differentiating capability.

List price is not a capability ranking, and that is why the decision cannot come out of an annual conversation with the vendor. A deal closed in January buys a price that the November read has already contradicted.

How much time does the top charge beyond money?

The first place spends 41.4 minutes per task, against 9.9 minutes for the 57-point model, 4.2 times more. The first answer is also slower: 197.42 seconds against 58.32 for Gemini 4 Neon. In interactive flow, time enters the cost per task.

ModelIndexTime per task (min)First response (s)
Claude Fable 5.2 (max)6541.4197.42
GPT-6.2 Astra (max)6214.0153.29
Gemini 4 Neon (xhigh)6123.858.32
Claude Opus 5.5 (max)5925.2340.46
GPT-6.2 Sol (max)579.980.69
Gemini 4 Hydrogen (xhigh)5416.447.64

There are two costs and only one shows up on the invoice. The invoice cost is the per task one, $26.54 against $1.01. The waiting cost is the time someone or some process sits idle until the answer exists, and it has no line on the statement.

Time does not follow the index either. The 59-point model takes 340.46 seconds to the first response, 1.7 times the time of the top, and the 54-point one answers in 47.64 seconds. Whoever chooses by index chooses time by accident.

The speed measurement base that changed reinforces the care: the page replaced the tokens per second metric with time per task, and the two measure different things. Time per task is what matters for waiting cost, and it is the only column this study uses.

In what kind of task does the top stop paying for itself?

The top pays for itself when the accuracy gain multiplied by the cost of a failed task exceeds $25.53, the difference to the 57-point model. At 1% gain, an error has to cost more than $2,553. At 5%, more than $510.

The math fits in one line: the extra cost per task has to be smaller than the accuracy gain times the cost of a failed task. The extra cost is $25.53, the difference between $26.54 and $1.01, and the accuracy gain is the only variable the buyer controls by measuring the task itself.

Decision tree that compares the cost of a failed task with the accuracy gain needed for the top model to pay for itself.
Cost of a failed task (US$)Accuracy gain required from the topRead
10255%the top never pays for itself
10025.5%out of reach in most tasks
1,0002.55%plausible on a hard task
10,0000.26%the top almost always pays for itself

The threshold table only gains meaning when it meets a task class. The bands below are an application example, not a measurement, and they serve to show where the decision changes sign.

Task classIllustrative error cost band (US$)Read
High volume triage with a reviewed answer1 to 10the top does not pay, stay between 51 and 57 points
Extraction and summary with human review10 to 100test the 57 to 62 point step
Technical opinion, code in production, contract draft100 to 1,000the top requires 2.6% to 25.5% gain, viable on the hardest tasks
Expert report, signed tax calculation, regulatory decisionabove 1,000the top pays for itself below 2.6% gain

Chained steps change the arithmetic in favor of the top. At 95% accuracy per step, ten steps close at 59.9% end to end; at 97%, at 73.7%. A two-point gain per step becomes 13.8 points at the end of the chain, and that is where the last step premium usually pays for itself.

Two caveats before turning this into a contract. The error cost bands are an application example, and none of them comes from the Artificial Analysis page. And the index is not an accuracy rate: 65 points are a composite of tasks, not the probability that the model gets the buyer's task right.

What changes in practice for whoever buys inference?

The decision stops being annual and per vendor, because the price of one index point changes with every read. It becomes a per-task rule in the gateway: which model serves each kind of work, what the acceptable cost ceiling per task is and when the router moves bands without a new negotiation.

In Nexforce Router, the per-task routing rule is applied at the gateway edge, not in the code of each application. The cost ceiling per task is a policy, and policy changes when the read changes. The vendor decision becomes an index band decision, reviewed on every leaderboard read.

The product already runs with real-time model ranking by performance and price, a spend ceiling per key and automatic failover between providers. The ruler that changes is cost per task instead of price per token, measured on the task the company actually runs. And the criterion this study adds is index band per task class, with a cost per task delta that the company accepts paying.

No savings percentage is promised here.

The savings depend on which band the company uses today, which task it accepts downgrading and how much an error costs in each one. Without those three answers, the routing rule is a guess with the appearance of policy.

Frequently asked questions

What is the cost per index point? It is the cost per task divided by the model index, a ratio that normalizes price per capability and shows how much is paid per unit of index. At the top of the Nov 23 read, the value is $0.41; at 57 points, $0.018. The ratio serves to compare cost efficiency, never to predict accuracy on the buyer's task.

Does a higher index guarantee a better result on my task? No. The index is a composite of several tasks, and a model can lead the composite while losing precisely on the task that matters to the buyer. The decision requires measuring your own set before paying the step, because 65 points are not a promise of accuracy.

Why does the most expensive model show the highest index? Because the last band of capability is scarce and the vendor charges for ranking position, not for linearity of capability. Between 62 and 65 points, the price per point jumps to $7.51, about 900 times the cost per point of the step between 51 and 57 points.

How often should this curve be reviewed? On every leaderboard read, because the top changes owner and the price of the index point changes with it. Between October 19 and November 23, the top moved from 58 to 65 points and the lead changed hands. An annual review arrives late in either case.

References and Further Reading

The three sources of this read are from Artificial Analysis, which also signs the methodology of the index and of the cost per task, and Nexforce did not run the benchmark. Nothing else was used, and no figure here comes from a Nexforce measurement.

How to cite this study and when it will be revised

To cite any number from this piece, use the read date next to the value: "Nexforce, cost per index point curve, read of November 23, 2026, data from Artificial Analysis". Attribution matters. The index and the cost per task are Artificial Analysis methodology, and what Nexforce did was the arithmetic over the 53-row table, with the frontier criterion and the break-even equation this text describes. The curve is revised on every leaderboard read, because the top changes owner and the price of the index point changes with it. The latest revision is the one from November 23, 2026, and it is dated in the title of this closing.

Nexforce

Save up to 50% in creditswith a single smart API

Connect your operations to our AI Router and optimize the consumption of multiple LLMs

Free Trial

Related articles